Hazardous Waste Management At Alang Sosiya Ship Breaking Yard
|
Taken by : Lalani Vidhi Bipinkumar
|
Guide By: Assis.Prof.H.S.Syed |
College : LDCE Ahmedabad Branch: Environment Engg.
|
|
Industry Name: GEPIL
|
IDP/UDP Field: Hazardous Waste Management at Alang Sosiya Ship Breaking Yard
|
Abstract: Waste Management |
|
Idp-bioremediation Of Excessive Oily Sludge |
Taken by : GREESHMA MISHRA |
Guide By: PROF.KHYATI.K.MODI |
College : Govt. Eng. College of Eng. Branch: Environment Engg.
|
|
Industry Name: IOCL-GR |
IDP/UDP Field: ENVIRONMENTAL |
Abstract: Petroleum industries unavoidably generate enormous quantity of oily sludge /oily soaked soil which constitutes a major challenge for hazardous waste management. Thus if such high concentration of oil sludge is disposed off directly on land then it can cause negative impact on environment. The yield of plant nutrients like nitrogen (N) and phosphorus (P) get decreased which affects the plant growth. And there can also be an increase in soil salinity. |
|
Taken by : Thummar Rashmita M.,Ribadiya Bansari M.,Patel Khushbu S. |
Guide By: Mr. Mihir Vyas |
College : GEC, Surat Branch: Environment Engg.
|
|
Industry Name: Garden silk mills, Vareli |
IDP/UDP Field: trouble shhoting and performance enhancement of activated sludge procss treating wastewater |
Abstract: Our project on trouble shooting & performance enhancement of activated sludge process treating waste water of a textile industry located in garden silk mills limited, vareli, kadodara;dist.surat.Hear, bleached cloth is coloured with dyes of various type, and printed with various design. waste water produced in this section is difficult to treat, especially from the point of view of colour removal and reduction of oxygen demand. The untreated textile wastewater can cause rapid depletion of dissolved oxygen if it is directly discharged into the surface water sources due to its high BOD value. Our main objective is to identify the problem in aeration tank of effluent treatment plant treating textile wastewater than to to suggest the remedial measures to ensure the proper operation of activated sludge process (ASP) and also to improve the overall removal efficiency interms of chemical oxygen demand (COD) and biochemical oxygen demand (BOD) from the ASP. |
|
Taken by : Shisodiya Preety S.,Patel Nidhi M.,Vankavala Dency K. |
Guide By: Mr.mihir Vyas |
College : GEC, Surat Branch: Environment Engg.
|
|
Industry Name: Enviro Control Asso.Pvt.Ltd |
IDP/UDP Field: Improvement in start up of Upflow Anaerobic Sludge Blanket(UASB)Reactor |
Abstract: The up flow anaerobic sludge blanket (UASB) process is the most successful new an aerobic reactor design for various industrial and municipal waste water. The start- up time of UASB reactor affects the whole system. Start-up is defined as “The act or instance of setting in operation or motion.” As been shown to be promising . If start-up of UASB reactor complete in less time the removal efficiency of system is improved in terms of COD and BOD. There is a need of faster start up of UASB in sewage treatment plant. UASB start up takes time and it is crucial part for successful operation. Successful start up is required so identification of methodology for successful granulation is required. In the present study, performance enhancement of start-up of UASB reactor and the identification of methodology will be studied. |
|
Taken by : Sisodiya Sonali Shailendrasingh, Tailor Unnati Bipinchandra,Patel Palak Yogeshbhai |
Guide By: Mr.mihir Vyas |
College : GEC, Surat Branch: Environment Engg.
|
|
Industry Name: Enviro Technology Limited |
IDP/UDP Field: Performance enhancement of activated sludge process using bioaugmentation |
Abstract: Shock loading in biological system is undesirable as it affects the performance of the system. Use of Bio-augmentation i.e. “Bio-augmentation can be defined as addition of pre-grown microbial population at the site to improve contaminant clean and reduce clean up time and cost.” As been shown to be promising. Bio-augmentation shall furnish the ultimate goal of biological system by providing improved removal efficiency in terms of COD, BOD removal. In the present study, performance enhancement of activated sludge process treating mixed effluent by addition of culture prepared using bio-augmentation will be studied |
|
Taken by : Thummar Rashmita M.,Ribadiya Bansari M.,Patel Khushbu S. |
Guide By: Mr. Mihir Vyas |
College : GEC, Surat Branch: Environment Engg.
|
|
Industry Name: Garden silk mills, Vareli |
IDP/UDP Field: trouble shhoting and performance enhancement of activated sludge procss treating wastewater |
Abstract: Our project on trouble shooting & performance enhancement of activated sludge process treating waste water of a textile industry located in garden silk mills limited, vareli, kadodara;dist.surat.Hear, bleached cloth is coloured with dyes of various type, and printed with various design. waste water produced in this section is difficult to treat, especially from the point of view of colour removal and reduction of oxygen demand. The untreated textile wastewater can cause rapid depletion of dissolved oxygen if it is directly discharged into the surface water sources due to its high BOD value. Our main objective is to identify the problem in aeration tank of effluent treatment plant treating textile wastewater than to to suggest the remedial measures to ensure the proper operation of activated sludge process (ASP) and also to improve the overall removal efficiency interms of chemical oxygen demand (COD) and biochemical oxygen demand (BOD) from the ASP. |
|
Taken by : Shisodiya Preety S.,Patel Nidhi M.,Vankavala Dency K. |
Guide By: Mr.mihir Vyas |
College : GEC, Surat Branch: Environment Engg.
|
|
Industry Name: Enviro Control Asso.Pvt.Ltd |
IDP/UDP Field: Improvement in start up of Upflow Anaerobic Sludge Blanket(UASB)Reactor |
Abstract: The up flow anaerobic sludge blanket (UASB) process is the most successful new an aerobic reactor design for various industrial and municipal waste water. The start- up time of UASB reactor affects the whole system. Start-up is defined as “The act or instance of setting in operation or motion.” As been shown to be promising . If start-up of UASB reactor complete in less time the removal efficiency of system is improved in terms of COD and BOD. There is a need of faster start up of UASB in sewage treatment plant. UASB start up takes time and it is crucial part for successful operation. Successful start up is required so identification of methodology for successful granulation is required. In the present study, performance enhancement of start-up of UASB reactor and the identification of methodology will be studied. |
|
Taken by : Sisodiya Sonali Shailendrasingh, Tailor Unnati Bipinchandra,Patel Palak Yogeshbhai |
Guide By: Mr.mihir Vyas |
College : GEC, Surat Branch: Environment Engg.
|
|
Industry Name: Enviro Technology Limited |
IDP/UDP Field: Performance enhancement of activated sludge process using bioaugmentation |
Abstract: Shock loading in biological system is undesirable as it affects the performance of the system. Use of Bio-augmentation i.e. “Bio-augmentation can be defined as addition of pre-grown microbial population at the site to improve contaminant clean and reduce clean up time and cost.” As been shown to be promising. Bio-augmentation shall furnish the ultimate goal of biological system by providing improved removal efficiency in terms of COD, BOD removal. In the present study, performance enhancement of activated sludge process treating mixed effluent by addition of culture prepared using bio-augmentation will be studied |
|
Total : 8 |